Steel frame building 1559-004

see how we build
1559.92 sqm (38.90 x 40.40 lm)
Description

The steel frame building is composed of 4 construction bodies, as follows: two bodies for monitoring the accesses in the exterior yard, one for the production hall with a surface area of 787 square meters, which also includes the administrative pavilion. The industrial area has two entrances for freight vehicles and two entrances for personnel. The 3 floor administrative pavilion includes a reception area, changing rooms, and restrooms on the ground floor. On the first floor, the following departments have been designed: a dining room that can be accessed directly from the production area, a cold kitchen, a spacious area for offices, and restrooms. The second floor has a conference room with access to a terrace, an office, and restrooms. In the exterior yard, there are 14 parking spaces, including one for people with disabilities.

Specifications

Total area (sqm): 1559.92
Gross floor area of hall (sqm): 1036.2
Gross floor area of offices (sqm): 477.84
Area of terraces + balconies (sqm): 45.88
Usable area of hall (sqm): 975.28
Usable area of offices (sqm): 404.46
Total footprint length x width (m): 38.90 x 40.40
Total height regime (nr): 3 story
Usable height of hall (m): 6
Usable height of office level (m): 2.6
Built-up area of hall ground floor (sqm): 924.16
Built-up area of hall first floor (sqm): 112.04
Built-up area of office ground floor (sqm): 151.04
Built-up area of office first floor (sqm): 176.04
Built-up area of office second floor (sqm): 150.76
Terraces on ground floor (sqm): 24.55
Terraces and balconies on second floor (sqm): 21.33
Number of offices (nr): 4

Tips and tricks

For light metal structures, depending on the desired insulation, the destination of the space, and preferences, we offer the following types of interior wall cladding systems:
1. Sandwich panels with polyurethane foam filling between 4-15 cm, galvanized steel sheet on the exterior
2. Filling the metal structure with basalt wool and cladding with OSB/fibro cement
3. No interior cladding