Specifications
Frequently Asked Questions
Where can I view the construction packages?
To see what our packages include, we invite you to access the price calculator by clicking the "Calculate construction price" button. After selecting the desired construction stage – step 4 – the app will ask if you want to view the available package presentation. Select "YES", and the system will display an interactive step-by-step presentation of the construction elements.
Can the projects shown on the website be modified?
Absolutely! The projects are designed as a starting point only. Want to change just the interior layout? No problem – the price stays the same, as all calculations are based on the built square meter. Want to increase or decrease the surface? You can do that from the very first step in the price calculator! Costs will adjust automatically, and if you'd like to test other options, you can go back to previous steps for a new price simulation.
Description
This steel frame house with a covered terrace is designed for owners who desire enhanced comfort provided by spacious areas. Thus, the ground floor incorporates a living room of over 40 sqm and a kitchen of almost 19 sqm. Both rooms can access a covered terrace, spacious enough for the entire family. The upper floor plan includes 3 bedrooms with above-average areas, one with a separate dressing room and bathroom. Another advantage is that each bedroom has access to a balcony. The recommended plot for this steel frame house will have a minimum width of 16.15 linear meters. The two story property is planned for families with a maximum of 5 members.
Tips and tricks
Lightweight metal structures are composed of self-supporting walls, built from "C" type profiles, cold-formed, from corrugated sheet. One of the particularities of metal-framed houses is that the building's structural resistance contains the roof part.
The compressive or tensile strength of the material used is 14x greater than that of wood. The metal frame is attached to the foundation using chemical anchors, usually repetitions at one-meter intervals - or according to the resistance project if it differs.
Assembling a metal structure on a 100 sqm construction site is done in a record time of 2 - 4 working days, because the panels are easy to handle and very rarely special lifting equipment is required.